August 12, 2008: I have about 3 inches done so far. I'm trying a new method of doing both socks at the same time.
September 18, 2008: Finally finished the 6 inches on the legs and started the heel flap. Got halfway through that.
September 20, 2008: Got through turning the heel.
September 22, 2008: Finished the gusset decreases and now working on the foot. I tried them on and they fit! (Although there is a gap between the stitches on one side of the heel of one sock; I think I should have picked up at least another stitch there.)
September 27, 2008: I have about another inch or so to go on the foot before I start decreasing for the toes.
October 1, 2008: Finished! And a perfect fit. I love them!